Drill-pipe conveyed logging unable to pass ledge in Iraq
Holefinder system facilitates wireline logging in an ‘impossible well’ in Iraq
An operator in Iraq was combating major issues with wellbore ledges in a well with only 6 deg deviation. After two wireline runs which were held up at shallow depth, the operator undertook a wiper trip, only to experience similar problems again on the 3rd attempt. The decision was made to run a TLC operation, however this was also unsuccessful.
In all a total of 5 days of rig time had been lost trying to pass a 20” washout with associated ledge.
Frustrated with the lack of results from conventional wireline and TLC, the operator sought the expertise of Petromac to log this critical well. A total of 6 descents were made with Petromac Wireline Express – all seamlessly conveyed to TD.


Related success stories
- IraqWireline ExpressPositive orientation provides 100% FMI image coverage in IraqRead the story
- Saudi ArabiaWireline ExpressCement evaluation without centralizers to 85° deviation in KSARead the story
- Saudi ArabiaWireline ExpressEfficient Logging with Advanced Conveyance Solutions saves ~38 hours of rig time in KSARead the story
